Metal building condensation happens when warm humid interior air contacts the cold underside of metal roof and wall panels. Closed-cell foam sprayed directly to the underside eliminates both the cold-surface condensation point and the air-leakage path. Typical cost for a Cincinnati 30x40 pole barn: $4,500-$9,500.
More detail
Uninsulated metal buildings produce condensation under specific conditions: warm humid interior air rises and contacts the cold (close to outdoor temperature) underside of the metal panels. Water condenses on the metal and drips. In a Cincinnati pole barn in October or April, this can produce noticeable rain inside the building during a single day, ruining stored goods and rotting wood subframing. The mechanism: dew point of the interior air rises above the surface temperature of the metal. Solutions other than foam are available but less effective. (1) Vapor barrier on the warm side of the assembly: prevents moisture migration to the metal. Works but requires careful detailing and doesn't add R-value. (2) Fiberglass batts in the rafter or wall cavity: adds R-value but requires a complete assembly (vapor barrier + batt + interior finish) to work; partial installs often make the condensation worse by trapping moisture at the metal surface. (3) Closed-cell spray foam directly on the underside of the metal: eliminates both the condensation surface (foam holds the metal at indoor temperature) and the air-leakage path. The Cincinnati pole-barn standard. 2-3 inches of closed-cell foam sprayed to the underside of the metal roof panels and metal wall panels. The foam adheres directly to the metal and follows the panel profile. Cost for a typical 30x40 pole barn (1,200 sqft floor area, roughly 2,000 sqft of roof and wall metal): $4,500-$9,500 depending on access (eaves clearance, interior obstructions) and the substrate condition. The result transforms the building from a condensation-and-temperature hazard into year-round-usable workshop or storage space. R-value side benefit: 2 inches of closed-cell delivers R-13 to R-14 on the assembly, plenty for an uncconditioned-but-tempered workshop space. Heating with a small forced-air or radiant heater becomes economical for the first time. Cincinnati installer note: metal building installs require BPI credentialing plus specific attention to ignition-barrier compliance if the building has any occupied use classification. Verify with the local building department before specifying foam thickness.